Automatic endoscope reprocessor

 
Find fast


Soluscope 2

      Validated Process
      Complete & Modular
      Endoscope Protection
      Microbiological Efficacy
      Chemistry

 

 

 




Installation requirements

   



All you need is:

- A water supply: 45°C, 3 bars

- A draining pipe: a pipe 20 cm higher than the Soluscope

- An electrical supply: 220 V, 16 Amps, 50 Hz


Soluscope 2: Automatic endoscope reprocessor











 
   
Soluscope is easy to install, compact and movable
 
   
  Water supply : optimal conditions of working    
   
 
Temperature
Flow
Pressure
Hardness
Filtration
 
45°C by thermostatic mixer
10 litres/mn
3 to 4 bars
< 12°TH
a 1 µm / 0.2 µm filtration  before Soluscope
If lower   -->
The cycle is longer
Use a disconnection tank
OK
Use a filtration unit
If higher -->
Only adjust the mixer
OK
Take a pressure
reducer
Use a softener
OK